Raspored konferencije
-
2023-11-08 (SVEČANO OTVARANJE E2023 / OPENING CEREMONY PP2023 Chair: Dr Predrag Stefanović, Prof. dr Dragoslava Stojiljković, Dr Dejan Cvetinović)
17:00-17:40Hotel Palisad - TARAOpening ceremony of the International Conference POWER PLANTS 2023Contribution
Speaker
Introductory word of the President of the Society of Thermal Engineers of Serbia
Dr Predrag Stefanović
Introductory word of the President of the Organizing Committee of PP2023
Dr Dejan Cvetinović
Introductory word of the President of the Energy Agency of the Republic of Serbia (AERS)
Mr. Dejan Popović
Introductory word of the Acting Director of the JSC “Elektroprivreda Srbije”
Dušan Živković
Introductory word of the Dean of Mechanical Engineering Faculty of the University of Belgrade, Serbia
Prof. dr Vladimir Popović
Introductory word of the Director of “VINČA” Institute of Nuclear Sciences – National Institute of the Republic of Serbia, University of Belgrade, Serbia
Prof. dr Snežana Pajović
Introductory word of the representative of the Ministry of Education, Science and Technological Development of the Republic of Serbia
To be defined
Introductory word of representative of the Ministry of Environmental Protection of the Republic of Serbia
To be confirmed
Introductory word of representative of the Chamber of Commerce and Industry of Serbia
Marko Čadež
Introductory word and official opening of the International conference POWER PLANT 2023 Assistant Minister of Mining and Energy of the Republic of Serbia - in charge of the electricity sector
Milan Aleksić
17:40-18:00Hotel Palisad - TARAProf. dr Nenad DJAJIĆ, Chairman of SWECONE HUNDRED YEARS OF SERBIAN COMMITTEE OF WORLD ENERGY COUNCIL18:00-18:20Hotel Palisad - TARAПроф. др Дејан ИВЕЗИЋНОВИ СТРАТЕШКИ ОКВИР ЕНЕРГЕТСКОГ СЕКТОРА РЕПУБЛИКЕ СРБИЈЕ18:20-18:40Hotel Palisad - TARAПроф. др Миодраг МЕСАРОВИЋКОНТРОВЕРЗЕ ЕНЕРГЕТСКЕ ТРАНЗИЦИЈЕ18:40-19:00Hotel Palisad - TARAАлександар ЈАКОВЉЕВИЋПОЛОЖАЈ ЕЛЕКТРОЕНЕРГЕТСКИХ КОМПАНИЈА У ЕНЕРГЕТСКОЈ ТРАНЗИЦИЈИ19:00-19:20Hotel Palisad - TARAProf. dr Aca MARKOVIĆSELECTION OF MANAGERS IN THE SERBIAN ENERGY SECTOR19:20-19:40Hotel Palisad - TARADragan BELONIĆREVITALIZATION OF HYDRO UNITS IN HPP “DJERDAP 1”19:40-20:00Hotel Palisad - TARAAWARDING CEREMONY / SVEČANA DODELA POVELJACharters of the Society of Thermal Engineers of Serbia and the Organizing Committee of the International Conference POWER PLANTS 2023:
1
To the Serbian Committee of the World Energy Council, CHARTER on the occasion of 100 years of successful work,
2
To the JSC ELEKTROPRIVREDA SERBIA, CHARTER on the occasion of the 130th anniversary of the start of operation of the first POWER PLANT in Belgrade, i.e. Serbia,
3
To the JSC ELEKTROPRIVREDA SRBIJE, a CHARTER on the occasion of the 123rd anniversary of the start of operation of the first hydroelectric power plant in Serbia, HIDROELEKTRANE POD GRADOM, i.e. 120 years of the beginning of operation of the second in Serbia - HYDROELEKTRANE VUČJE,
4
To the JSC ELEKTROPRIVREDA SERBIA, Branch of Hidroelektrane Đerdap, CHARTER on the occasion of 65 years of successful operation of HPP Vrla 4 within the Vlasina hydroelectric power plants,
5
To the JSC ELEKTROPRIVREDA SERBIA, Branch of Drinsko-Limska Hydroelectric Power Plant, CHARTER on the occasion of 65 years of completion of construction (commissioning of unit 4) and successful operation of HPP Zvornik,
6
To the JSC ELEKTROPRIVREDA SERBIA, Branch of Drinsko-Limska Hydroelectric Power Plant, CHARTER on the occasion of 55 years of completion of construction (commissioning of unit 4) and successful operation of HPP Bajna Bašta,
7
To the JSC ELEKTROPRIVREDA SERBIE, Branch of Thermal Power Plant Nikola Tesla, CHARTER on the occasion of 45 years of successful operation of the TENT A4 unit,
8
To the JSC ELEKTROPRIVREDA SERBIA, Branch of Thermal Power Plant Nikola Tesla, CHARTER on the occasion of 40 years of successful operation of the first unit in the region of 620 MW, TENT B1,
9
To the JSC ELEKTROPRIVREDA SERBIE, Branch of Thermal Power Plants and Mines Kostolac, CHARTER on the occasion of 35 years of successful operation of the first unit in TPP Kostolac B,
10
JSC ELEKTROPRIVREDA SRBIJE, Branch of Hidroelektrana Đerdap, CHARTER on the occasion of the completion of the revitalization of the unit at HPP Đerdap 1
20:30-00:00Hotel Palisad restaurant / Restoran Hotela PalisadCONFERENCE DINNER / SVEČANA VEČERA UČESNIKA I GOSTIJU KONFERENCIJE -
2023-11-09 (ENVIRONMENTAL AND CLIMATE ASPECTS OF POWER PLANTS OPERATION - Chair: Prof. dr Midrag Mesarević, Prof. dr Dragoslava Stojiljković, Dr Slobodan Đekić)
09:00-09:20Hotel Palisad - TARAPeter Vajda, Senior Environmental ExpertIMPLEMENTATION OF ENVIRONMENTAL LEGISLATION TO REDUCE AIR EMISSIONS OF LARGE COMBUSTION PLANTS IN THE ENERGY COMMUNITY – IN THE MIDDLE OF A LONG ROAD09:20-09:40Hotel Palisad - TARAProf dr Dragan IgnjatovićUGALJ - SADAŠNJE STANJE I PERSPEKTIVE U SRBIJI I SVETU09:40-10:00Hotel Palisad - TARALjiljana Velimirović, Bsc.Sc.Mech.Eng. Lead Project manager I, Dr Andrej Stanimirović, Bsc.Sc.Mech.Eng. Project manager ICONSTRUCTION OF FLUE GASES DESULPURISATION PLANT THERMAL POWER PLANTS "NIKOLA TESLA" A3-A610:20-10:40Hotel Palisad - TARADr Andrej Stanimirović, B.Sc.Mech.Eng. Project Manager I, Ljiljana Velimirović, B.Sc.Mech.Eng. Lead Project Manager ICONSTRUCTION OF FLUE GASES DESULPURISATION PLANT THERMAL POWER PLANTS “NIKOLA TESLA” B10:20-10:40Hotel Palisad - TARAZdravko Ivančić, Dino Rendulić, Bojan KrunićAPPROACH AND ANALYSIS OF THE STRENGTH AND STABILITY OF FLUE GAS DUCTS AT TENT B10:40-11:00Hotel Palisad - TARAMartin SchreyerTHE FUTURE OF ENERGY WITH DIGITAL SOLUTIONS FOR POWER PLANTS11:00-11:20Hotel Palisad - TARAIstván KovacsicsTHE IMPACT OF ASH SLURRY PARAMETERS ON THE ENVIRONMENTAL PERFORMANCE OF COAL COMBUSTION RESIDUE LANDFILLS11:20-11:40Hotel Palisad - TARADario ŠkoroWHAT TO DO WITH THE EXISTING ESP TO MEET THE NEW EMISSION LEVEL?11:40-12:00Hotel Palisad - TARAPetar Tatomirović, Nenad VeljovićSIEMENS ENERGY - GLOBALNI LIDER U ENERGETICI12:00-12:30Hotel Palisad - Refreshment hol / Mesto za kafuCoffee and refreshment / Kafe pauza12:30-12:50Hotel Palisad - TARAVojin GrkovićTRANSITION OF ENERGY SYSTEMS – A GENERAL APPROACH12:50-13:10Hotel Palisad - TARAGligor Kanevce, Aleksandar Dedinec, Aleksandra DedinecSTRATEGIC SPATIAL ANALYSIS AND SITE SELECTION FOR PHOTOVOLTAICS AND WIND POWER PLANTS13:10-13:30Hotel Palisad - TARAIvan Mrvaljević, Milutin ĐukanovićRES AS A DEVELOPMENT PRIORITY OF EPCG13:30-13:50Hotel Palisad - TARATamara Jelić, Goran Jakupović, Pavle Lučić, Gordan Konečni, Dragan Surudžić, Mileta ĐurkovićIMPLEMENTACIJA NOVOG CENTRALNOG DISPEČERSKOG SISTEMA (CDS) I SISTEMA UPRAVLJANJA PROIZVODNJOM (SUP) EPS-A13:50-14:10Hotel Palisad - TARANenad Jerinić, Marko Panić, Marija HuravikTE-TO PANČEVO, PRVO GASNO-PARNO KOMBINOVANO POSTROJENJE ZA PROIZVODNJU ELEKTRIČNE I TOPLOTNE ENERGIJE SNAGE DO 200 MWE U R. SRBIJI, IZGRADNJA I PRVIH GODINU DANA KOMERCIJALNOG RADA14:10-15:20Hotel Palisad restaurant / Restoran Hotela PalisadLunch break / Pauza za ručak -
2023-11-09 (Sesija br. 1 / Session No. 1 - ENVIRONMENTAL AND CLIMATE ASPECTS OF POWER PLANTS OPERATION - Chair: Dr Ivan Tomanović, Dr Dejan Cvetinović)
15:30-15:50Hotel Palisad - TARAMilica M. Ilic, Vladimir D. Stevanovic, Milan M. Petrovic, Sanja S. MilivojevicFLEXIBILITY OF POWER GENERATION AND POSSIBILITIES FOR FEASIBLE UPGRADES OF COAL POWER PLANTS: A CASE OF THE ELECTRIC POWER INDUSTRY OF SERBIA15:50-16:10Hotel Palisad - TARAZoran Šljukić, dipl.el.ing. – tehnički direktorEKOLOŠKA REKONSTRUKCIJA TE PLJEVLJA16:10-16:30Hotel Palisad - TARAMarija Huravik, Nenad Jerinic, Marko PanicTHE USE OF NATURAL GAS FOR THE PRODUCTION OF HEAT AND ELECTRICITY IN TETO PANCEVO FROM THE ASPECT OF NITROGEN OXIDE EMISSIONS AND ENVIRONMENTAL IMPACT16:30-16:50Hotel Palisad - TARAТатјана Војводић, Биљана ГлигоријевићРЕЗУЛТАТИ ПРИМЕЊЕНИХ МЕРА И МОДЕРНИЗАЦИЈА У ТЕ КОСТОЛАЦ Б У ЦИЉУ СМАЊЕЊА ЕМИСИЈЕ ЗАГАЂУЈУЋИХ МАТЕРИЈА У ВАЗДУХ ИСПОД ДОЗВОЉЕНИХ ВРЕДНОСТИ16:50-17:10Hotel Palisad - TARAGoran Stupar, Dragan Tucaković, Ognjen StamenkovićMEASURES FOR INCREASING OVERALL HEAT OUTPUT AND ECOLOGICAL PERFORMANCES OF TPP KOSTOLAC B UNIT 1 AFTER APPLYING PRIMARY DE-NOX MEASURES17:10-17:30Hotel Palisad - TARASrđan Milić, Milan V. Petrović, Đorđe Petković, Dejan Đukanović, Aleksandar Ilić, Igor Damnjanac, Miloš Popović, Slobodan PelemišPRAĆENJE GLAVNIH RADNIH KARAKTERISTKA PARNOG TURBOPOSTROJENJA TE NIKOLA TESLA B1 U TOKU DUGOGODIŠNJEG RADA17:30-17:50Hotel Palisad - TARAAna Mitić, dr. Sanja Petrović Bećirović, Danila StančevićENVIRONMENTAL EFFECTS OF THE "VINČA" COMPLEX CONSTRUCTION WITH THE FIRST MUNICIPAL WASTE-TO-ENERGY PLANT IN SERBIA17:50-18:10Hotel Palisad - TARAN. Radmilović, S. Jovanović, N. Matić, B. Papić , P. Tatomirović, N. Veljović, M. NikolićARS T-MOD MODULE FOR ON-LINE DIAGNOSTICS OF 350MW THERMAL POWER UNIT -
2023-11-09 (Sesija br. 2 / Session No. 2 - RENEWABLE ENERGY SOURCES - Chair: Dr Slobodan Cvetković, Dr Nikola Živković)
15:30-15:50Hotel Palisad - MORAVABranislava ZubićPOWER PLANTS IN AUTONOMOUS PROVINCE OF VOJVODINA15:50-16:10Hotel Palisad - MORAVAPredrag ĐorđevićOBNOVLJIVI IZVORI ENERGIJE U KOSTOLCU – VETROELEKTRANA KOSTOLAC - PRESEK STANJA NA PROJEKTU16:10-16:30Hotel Palisad - MORAVARastislav Kragić, Biljana Lovčević Kureljušić, Nenad V. PavlovićPROGRAM IZGRADNJE SOLARNIH FOTONAPONSKIH ELEKTRANA SA POSEBNIM OSVRTOM NA BENZINSKE STANICE16:30-16:50Hotel Palisad - MORAVAKlara Balog-AranjošSOLARNE ELEKTRANE NA KROVOVIMA POLЈOPRIVREDNIH GAZDINSTAVA U VOJVODINI OD 2016. DO 2020.GODINE17:10-17:30Hotel Palisad - MORAVAZeljko V.Despotovic, Miodrag VukovicDESIGN OF THE GROUNDING SYSTEM OF THE 2.4MW FREE-FIELD PHOTOVOLTAIC POWER PLANT WITH STRING INVERTERS17:30-17:50Hotel Palisad - MORAVAZeljko V. Despotović, Miodrag Vuković, Bojan SimonovićTHERMAL IMAGING OF THE STRING INVERTERS AC DISTRIBUTION OF THE ROOFTOP PHOTOVOLTAIC POWER PLANT 500KW IN THE GRUNER FACTORY-VLASOTINCE17:50-18:10Hotel Palisad - MORAVAVladan S. Jovanović, Branka Radovanović, Mirjana S. LakovićREVIEW AND POTENTIAL IMPROVEMENT OF THE ELECTRIC POWER PRODUCTION SYSTEM WITHIN AN ENERGY-EFFICIENT COMMERCIAL BUILDING IN NIŠ -
2023-11-09 (Okrugli sto / Round Table - PREKOGRANIČNI MEHANIZAM PORAVNANJA TAKSI NA UGLJENIK - Chair: Prof. Dr Dragoslava Stojiljković, Dr Branislava Lepotić Kovačević)
18:15-20:00Hotel Palisad - TARAОКРУГЛИ СТО: Прекогранични механизам поравнања такси на угљеник (CBAM) на електропривреде Западног Балкана, могуће учешће у ЕУ систему трговине емисијама и пратећи финансијски механизамPozdravna reč:
prof.dr Dragoslava Stojiljković, potpredsednica Društva termičara Srbije, Mašinski fakultet, Univerziteta u Beogradu
Uvodna reč i moderiranje: dr Branislava Lepotić Kovačević, predsednica UPES
Teme i Učesnici:
- Tematsko izlaganje: Potencijalni efekti mehanizma prekograničnog poravnanja teksi na ugljenik (CBAM) i cena ugljenika na privredu i elektroprivredu Republike Srbije - Ljubo Maćić, Ekonomski institut u Beogradu
- EU ETS i moguća finansijska podrška investicijama u elektroprivredi – Aleksandar Kovačević, Oksfordski institut za energetske studije
- Elektroprivreda Bosne i Hercegovine i cene ugljenika – dr Anes Kazagić, Elektroprivreda Bosne i Hercegovine
- Studija slučaja: Sistem trogivne emisijama u Crnoj Gori – Nebojša Dožić, Aluminijumski kombinat, Podgorica
DISKUSIJA
Ljubo MaćićCHALLENGES OF CARBON PRICING IMPLEMENTATIONS IN SERBIA AND THE WESTERN BALKANS -
2023-11-10 (Sesija br. 3 / Session No. 3 - IMPLEMENTATION OF NEW POLICIES, TECHNOLOGIES, INNOVATIVE SOLUTIONS AND EQUIPMENT - Chair: Dr Biljana Vučićević, Dr Dejan Cvetinović)
09:00-09:20Hotel Palisad - TARAМиодраг Додер, Ђорђије ДодерПРОЦЈЕНА ЕФЕКАТА РЕКОНСТРУКЦИЈЕ РАСХЛАДНОГ ТОРЊА ТЕ ГАЦКО НА ПОВЕЋАЊЕ ЕФИКАСНОСТИ ПОСТРОЈЕЊА09:20-09:40Hotel Palisad - TARABranka Gvozdenac Urošević, Nebojša ĆorovićIZAZOVI DEKARBONIZACIJE ELEKTRO ENERGETSKOG SEKTORA KROZ ANALIZU TRŽIŠTA ELEKTRIČNE ENERGIJE09:40-10:00Hotel Palisad - TARAEdo JerkićOBNOVLJIVI IZVORI ENERGIJE NA TRŽIŠTU ELEKTRIČNE ENERGIJE10:00-10:20Hotel Palisad - TARAPeter NyiriWATER SAVING METHODS FOR COOLING SYSTEMS SERVING FOSSIL FUEL-FIRED POWER GENERATION10:20-10:40Hotel Palisad - TARAMilan M. Petrovic, Vladimir D. Stevanovic, Sanja S. Milivojevic, Milica M. IlicUTILIZATION OF THE FLUE GAS WASTE HEAT BY THE LOW-PRESSURE ECONOMIZER AT 350 MWE LIGNITE-FIRED POWER PLANT10:40-11:00Hotel Palisad - TARAMarko Lazarević, Boško Baćić, Danilo Đurica, Indir Mujanić, Jovan ŠkundrićANALYSIS OF PROCESS PARAMETERS AND INFLUENTIAL FACTORS ON THE OPERATION OF AN AIR-COOLED CONDENSER AT TPP STANARI - CONSIDERING EFFICIENCY IMPROVEMENT POSSIBILITIES11:00-11:20Hotel Palisad - TARAJ. Škundrić*,1, M. Laković2, D. Mitrović(s)2, P. Živković2, D. Knežević1, M. Tomić3MODERN PLANT CONDENSER DESIGN AND ANALYSIS11:20-11:40Hotel Palisad - TARAMarko S. Djurovic , Zeljko V. DespotovicOPTIMIZING THE ARRANGEMENT OF PHOTOVOLTAIC PANELS OF THE 800KW SOLAR POWER PLANT MOUNTED ON THE ROOF SLOPES OF THE ONE FACTORY HALL11:20-12:00Hotel Palisad - Refreshment hol / Mesto za kafuCoffee and refreshment / Kafe pauza -
2023-11-10 (Sesija br. 4 / Session No. 4 - ENERGY RESOURCES - Chair: Dr Aleksandar Milićević, Dr Nikola Živković)
09:00-09:20Hotel Palisad - MORAVADragana Životić, Violeta Gajić, Sabina Kovač, Bogdan Radić, Marko Glavonić, Zoran Miladinović, Daliborka BelićPETROGRAFSKA, MINERALOŠKA I HEMIJSKA KARAKTERIZACIJA ROVNOG UGLJA IZ RUDNIKA LIGNITA KOVIN (SRBIJA)09:20-09:40Hotel Palisad - MORAVALidija Joleska BureskaCHOICE OF COAL FOR MIXING WITH EXISTING FOR IMPROVING THE PERFORMANCE OF ENERGETIC BOILERS09:40-10:00Hotel Palisad - MORAVAMilan Đorđević, Branimir StojanovićANALYSIS OF THE POSSIBILITY OF USING DRIED COAL FOR THE PURPOSE OF IMPROVING THE QUALITY OF COAL FOR THERMAL POWER PLANTS10:00-10:20Hotel Palisad - MORAVANikola V. ŽIVKOVIĆ, Dejan B. CVETINOVIĆ, Vukman V. BAKIĆ, Aleksandar M. ERIĆ, Predrag D. ŠKOBALJSIGNIFICANCE AND NECESSITY OF COAL EMISSION FACTOR PERIODIC DETERMINATION - EXAMPLE OF THE LIGNITE FROM KOSTOLAC BASIN10:20-10:40Hotel Palisad - MORAVAAleksandar R. Milićević, Srđan V. Belošević, Milić D. Erić, Zoran J. Marković, Ivan. D. Tomanović, Nenad Đ. Crnomarković, Andrijana D. StojanovićRANDOM FOREST MODEL FOR DETERMINATION OF THE LOWER HEATING VALUE OF TPP “KOLUBARA A” COAL10:40-11:00Hotel Palisad - MORAVAMiloš Radojević, Bojan Janković, Vladimir Jovanović, Anes Kazagić, Nihad Hodžić, Kenan Kadić, Dragoslava Stojiljković, Nebojša Manić, Xuebin WangA MODEL-BASED KINETIC MODELLING APPROACH FOR ASSESSMENT OF LOW-RANK COAL AND BIOMASS CO-COMBUSTION CHARACTERISTICS11:00-11:20Hotel Palisad - MORAVAIvan D. Tomanović, Srđan V. Belošević, Aleksandar R. Milićević, Nenad Đ. Crnomarković, Andrijana D. StojanovićPOSSIBILITIES FOR PARALLEL COMPUTATIONS IN UTILITY SCALE FURNACE: THE CODE STRUCTURE ANALYSIS11:20-12:00Hotel Palisad - Refreshment hol / Mesto za kafuCoffee and refreshment / Kafe pauza -
2023-11-10 (Sesija br. 5 / Session No. 5 - HYDRO POWER PLANTS OPERATION CHALLENGES - Chair: Dr Ivan Tomanović)
12:00-12:20Hotel Palisad - TARADalibor DraškovićEXPERIENCE AND CHALLENGES IN DESIGNING OF PUMPED STORAGE PLANTS – PSP “BISTRICA”12:20-12:40Hotel Palisad - TARANikola Vasiljević, Željko Damljanović, Milan Josifović, Goran Jakupović, Milan Bjedov, Ninel Čukalevski, Vladan GemaljevićSIMULATOR ZA TESTIRANJE GRUPNOG REGULATORA REAKTIVNE SNAGE HIDROELEKTRANE ĐERDAP 112:40-13:00Hotel Palisad - TARAJ. ILIĆ, Đ. KOKOVIĆ, V. PETROVIĆ, D. STANKOVIĆREVITALIZATION OF HYDROPOWER PLANTS IN EPS JSC – PROJECTS AT THE BEGINNING OF IMPLEMENTATION13:00-13:20Hotel Palisad - TARAJovan Ilić, Ivan Božić, Aleksandar Petković, Aleksandar LatinovićDEVELOPMENT AND VALIDATION OF NUMERICAL TOOL FOR T-DOMAIN ANALYSES OF TURBINE GOVERNING OF HYDROPOWER PLANTS13:20-13:40Hotel Palisad - TARAJelica Pešić, Ivan Božić, Bogdan RistićNUMERICAL ANALYSIS OF THE EXISTING FRANCIS TURBINE ENERGY CHARACTERISTICS AT THE HPP BISTRICA [НУМЕРИЧКА АНАЛИЗА ЕНЕРГЕТСКИХ КАРАКТЕРИСТИКА ПОСТОЈЕЋЕ ФРАНСИС ТУРБИНЕ У ХЕ БИСТРИЦА]13:40-14:00Hotel Palisad - TARARadovan ĐUKANOVIĆREZULTATI RADA I PLANOVI ZA UNAPREĐENJE KAPACITETA I EFIKASNOSTI RADA HE „PERUĆICA“14:00-14:20Hotel Palisad - TARAŽeljko RatkovićIMPACT OF PLANNED HYDRO POWER PLANTS ON POWER SYSTEM AND CLIMATE CHANGE IN THE REPUBLIC OF SRPSKA -
2023-11-10 (Sesija br. 8 / Session No. 8 - SIDE EVENT – STABILISE project disseminations activities Chair: Dr Dejan Cvetinović)
12:15-12:35Hotel Palisad - MORAVASide Event – STABILISE project dissemination activitiesMilica R. MLADENOVIĆ, Ana D. MARINKOVIĆ, Aleksandar M. ERIĆ, Dejan B. CVETINOVIĆ and Biljana S. VUČIĆEVIĆPOSSIBLE SOLUTIONS TO THE CHALLENGES ASSOCIATED WITH BIOMASS COMBUSTION12:35-12:55Hotel Palisad - MORAVAБојан Јанковић, Марија Јанковић, Слободан Цветковић, Небојша Манић, Милена Пијовић-Радовановић, Јована Перендија, Дејан ЦветиновићПРЕГЛЕД КАТАЛИТИЧКЕ ГАСИФИКАЦИЈЕ БИОМАСЕ ПОГОДНЕ ЗА ИНДУСТРИЈУ У РЕПУБЛИЦИ СРБИЈИ12:40-13:00Hotel Palisad - MORAVAMilica R. MLADENOVIĆ, Dejan B. CVETINOVIĆ, Aleksandar M. ERIĆ, Bojan Ž. JANKOVIĆ, Marija JANKOVIĆ, Milena PIJOVIĆ-RADOVANOVIĆBIOMASS FOR CLEAN ENERGY SOLUTION: BIOMASS GASIFICATION13:00-13:20Hotel Palisad - MORAVAAleksandar ERIĆ, Dejan CVETINOVIĆ, Slobodan CVETKOVIĆ, Jovana PERENDIJA, Milena PIJOVIĆ-RADOVANOVIĆ, Bojan JANKOVIĆSEWAGE SLUDGE FROM WASTEWATER TREATMENT PLANTS FOR ENERGY PURPOSES: THERMODYNAMIC APPROACH13:20-13:40Hotel Palisad - MORAVASlobodan Cvetković, Jovana Perendija, Stefan Pavlović , Bojan Janković, Marija Janković, Aleksandar Erić, Dejan CvetinovićPROCENA UPOTREBE SOJINE SLAME U MAČVANSKOM OKRUGU ZA PROIZVODNJU VODONIKA POSTUPKOM GASIFIKACIJE VODENOM PAROM13:40-14:00Hotel Palisad - MORAVAMilica Perić , Mirko KomatinaLIFE CYCLE ASSESSMENT OF MAIN BIOMASS SUPPLY CHAINS IN SERBIA - INITIAL EVALUATIONS14:00-14:20Hotel Palisad - MORAVAMomčilo MomčilovićVISOKO EFIKASAN KOMBINOVANI ENERGETSKI CIKLUS INTEGRISANE PLAZMA GORIVE ĆELIJE (IPFC) NA FOSILNA GORIVA I BIOMASU ZA PROIZVODNJU ELEKTRIČNE ENERGIJE, VODONIKA I SINTETIČKOG GORIVA SA SMANJENOM ILI NULTOM EMISIJOM CO214:20-14:40Hotel Palisad - MORAVABranka Radovanović, Vladan S. Jovanović, Mirjana S. LakovićTESTING THE PERFORMANCE OF THE CONDENSATION DRYER IN THE PLUM DRYING PROCESS14:40-15:00Hotel Palisad - TARAClosing of the conference / Zatvaranje konferencije